{{ template "sync/layout/authenticated.html" . }} {{ define "title" }}Planning{{ end }} {{ define "extraheader" }} {{ end }} {{ define "content" }}

Daily Planning Workbench

Signals and leads enter from the left, are investigated in the center, and transformed into structured field assignments using tools on the right.
Incoming Signals & Leads
Species
Signal Type
Sort By

Signals
Public Report – Service Request #1024
Aedes aegypti • Standing Water Complaint
Trap Spike – H3 8828308281fffff
Culex pipiens • Adult Surge
Residual Expiring – Parcel 45-233-01
Reinspection Due

Mosquito Control Plan Follow-Ups
Plan Follow-Up – Greenway HOA Basin
Residential Section • Verification Required
Plan
Plan Follow-Up – Ag Irrigation Canal 7B
Ag Section • Monitoring Window
Plan

Existing Leads
Lead #L-204
3 Signals • Aedes aegypti
Lead #L-198
2 Signals • Culex pipiens
Active Investigation Workbench
Map Placeholder
H3 Cells • Parcels • Signal Density • Lead Clusters
Selected Signals
3 Signals Selected
  • Public Report – Aedes aegypti
  • Trap Spike – Culex pipiens
  • Plan Follow-Up – HOA Basin
Derived Lead Strength
Signal Convergence Score
High Confidence
Related Communications
Inbound & outbound contact
  • Resident follow-up requested
  • HOA notification sent
Priority Context
Risk synthesis
Elevated Aedes Risk
Transformation Tools
Signal → Lead

Lead → Field Assignment

Assignment Controls
{{ end }}